Crest Diary Entry No.3 – Foundations
In our last diary entry, construction of the pavilion had begun with the contractor stripping the existing concrete and substructure to lower the site levels to allow the foundations to be dug for the arrival of the ‘Glulam’ frame and the fitting of the SIP in the New Year.